20 SEPTEMBER 2026 · BRIEFING #08
AAI Moves Forward with Dual EPC Procurement for Airside & Terminal Packages
The Airports Authority of India has formally initiated the bidding phase for the comprehensive civil revival of Mamnoor Aerodrome. Divided into two primary tenders totaling over ₹417 Crores, the civil engineering work will expand the runway to 2,500m for Airbus A-320 Code-C jets while establishing a 6,800 sqm passenger terminal building (850 PHP), an ATC-Technical block (6,000 sqm), and a Category-VIII fire station.
14 AUGUST 2026 · BRIEFING #07
Telangana State Completes Formal Handover of 253 Acres for Mamnoor Expansion
In accordance with Government Order sanctions, revenue authorities in Warangal district have concluded boundary demarcation and physical possession handover of 253 acres surrounding the Mamnoor airstrip. The expanded parcel fulfills AAI’s prerequisite for establishing ICAO Code 3C instrument approach safety buffers, runway basic strip dimensions (280m wide), and runway end safety areas (RESA).
28 JUNE 2026 · BRIEFING #06
Perimeter Security Wall & Patrol Road Works Sanctioned at ₹21.40 Crores
To secure the expanded aerodrome perimeter against encroachment and animal incursions, the state infrastructure administration and AAI have authorized construction of a reinforced concrete boundary wall complete with patrol roads, perimeter lighting, CCTV watchtowers, and CISF operational checkpoints.
15 APRIL 2026 · BRIEFING #05
MoCA Evaluates Mamnoor for Inclusion in Regional Aviation UDAN Network
This briefing records reported discussion of Mamnoor Airport in the context of regional connectivity and potential UDAN-linked services. The destinations mentioned are prospective and do not represent current scheduled services.